Delivery of complete electric equipment for high-efficiency long-wall complex for the voltage of 1kV & 0,5kV, including two two-outflow compact units for the voltage of 3kV with possible switching for working in the 6kV grid, two transformer stations – one with the power of 1000kVA and voltage ratio 3(6)/1(0,5)kV and the second with the power of 700kVA and voltage ratio 3(6)/0,5(1)kV, four maneuvering sets with the rated current 1200A, flameproof contactor switch 500A, three transformer units for 230V & 127V and power 5kVA each, complete control, communication and interlocks system, long-wall complex lighting system, supervision over assembly and start-up.