Realizations

YCRT Rio Turbio – 4 heading com-plexes with KTW-200 combines

back

Client:

YCRT Rio Turbio

Date:

2015 - 2017

Country:

Argentina
next realization →

Delivery of four electric equipment completes for supply of belt conveyors and mine-face devices, heading complexes with the KTW-200 combines. Electric equipment for each complex included one transformer station with the power of 1250kVA and voltage ratio of 6,6/1,1kV and one transformer station with the power of 900kVA and voltage ratio of 6,6/1,1/0,55kV, thyristor starter with the rated current of 1200A, maneuvering unit with the rated current of 1200A, automation and control system for belt conveyors and mine-face devices, mine-face complex parameters visualization, complete of cables and power leads, heading complex lighting system, supervision over assembly and start-up.